WORKS
- FEASIBILITY STUDIES FOR WASTE-TO-ENERGY PLANTS
01-A ZAMBON GROUP plant (Lonigo – Vicenza - Italy) for salty wastewaters, with evaporator
01-B VISCOLUBE waste-to-energy plant (Pieve Fissiraga – Lodi - Italy)
01-C TOFIGH DAROU plant (Tabriz – Iran) for highly salty wastewaters, with evaporator
01-D POLIMERI EUROPA ELASTOMERES FRANCE plant (Champagnier – Grenoble – France) for gaseous and liquid waste
01-E Plant for aluminium containing flexible packaging waste with heat recovery and flue gas cleaning and filtration
01-F CHEMI plant (Patrica – Frosinone – Italy) for gaseous and liquid (salty wastewaters and spent solvents) waste
01-G VISCOLUBE (Pieve Fissiraga – Lodi - Italy) off-gas incineration plant with heat recovery and flue gas cleaning and filtration


- SUPPLY UNDER T.A.E. (TEMPORARY ASSOCIATION OF ENTERPRISES) OF WASTE-TO-ENERGY PLANTS
02-A POLIMERI EUROPA ELASTOMERES FRANCE plant (Champagnier – Grenoble – France) for gaseous and liquid waste
02-B Waste-to-energy plant for hospital waste, water depuration sludge, spent solvents and salty wastewaters – Slovakia

- SUPPLY UNDER T.A.E. OF WASTE-TO-ENERGY PLANTS FOR SALTY WASTEWATERS, WITH EVAPORATOR
03-A One-stage evaporator, one furnace
03-B 3+-stage evaporator + rotary hearth furnace + concentration and depletion tower, as for ZAMBON GROUP plant

- REGENERATIVE OXIDIZER FOR CHLORINATED OFF-GAS
04-A Off-gas termorigenerative combustor S.I.R.O. S.p.A.

- ENGINEERING SERVICES
- DESIGN OF SPECIAL INDUSTRIAL BURNERS
06-A Burner for the VISCOLUBE off-gas incineration plant (Pieve Fissiraga – Lodi - Italy)
06-B Primary burner for CHEMI plant (Patrica – Frosinone – Italy) for gaseous and liquid waste
06-C Video-screens for burners of ZAMBON GROUP and CHEMI plants
06-D NG-fired secondary burner for a postcombustion chamber (afterburner)
06-E Example of solid shredded waste (aluminium containing flexible packaging waste) that is pneumatically transported to intermediate charging silo or directly to a C+A design burner

- ENGINEERING AND SUPPLY OF ELECTRIC BOARDS (BOTH POWER AND AUTOMATION)
07-A Automation board (partly fail-safe) of a waste-to-energy plant (dangerous industrial waste)
07-B Automation board of nitrogen-blanketing system for an industrial shredder

- BLANKETING SYSTEMS FOR INDUSTRIAL WASTE SHREDDERS AGAINST EXPLOSION DANGER
08-A 1 ton/h shredder for dangerous solid waste, nitrogen blanketed by a C+A process and automation. Supplied by SATRIND s.r.l. – Arluno (Milan) for the ZAMBON GROUP waste-to-energy plant (Lonigo – Vicenza - Italy) (2001).
08-B 10 ton/h shredder for industrial dangerous waste of solid and muddy nature, nitrogen blanketed by a C+A process and automation. Supplied by SATRIND s.r.l. – Arluno (Milan) to ENERGIS S.A. – Albox (Spain) – HOLCIM GROUP (2004).

- TECHNICAL CONSULTANCY TO INDUSTRY